Show simple item record

Deregulated Distribution System Planning - Incremental Capacity Auction Mechanism with Transactive DERs

dc.contributor.authorMohamed, Amr A.
dc.contributor.authorSabillon-Antunez, Carlos
dc.contributor.authorGolriz, Ali
dc.contributor.authorLavorato, Marina
dc.contributor.authorRider, Marcos J.
dc.contributor.authorVenkatesh, Bala
dc.date.accessioned2024-01-22T13:42:42Z
dc.date.available2024-01-22T13:42:42Z
dc.date.issued2022-12
dc.identifier.citationVenkatesh, Bala & Goariz, Ali & Lavorato, Marina & Adel, Amr & Rider, Marcos J. & Sabillon, Carlos. (2022). Deregulated Distribution System Planning - Incremental Capacity Auction Mechanism With Transactive DERs. IEEE Transactions on Power Delivery. PP. 1-1. 10.1109/TPWRD.2022.3150256.es
dc.identifier.issn0885-8977
dc.identifier.urihttps://hdl.handle.net/20.500.12412/4947
dc.description.abstractHigh penetrations of distributed energy resources (DERs) are driving the transformation of traditional distribution networks into transactive energy distribution systems (TEDS). TEDS depart from conventional distribution system constructs to 1) enable a local distribution operator to maximize social welfare, 2) enable peer-to-peer energy transactions, 3) extract maximum participation and benefits from DERs, 4) usher in competition in the distribution sector to supply electricity via DERs, and 5) hold the potential for a lower asset cost solution, greater customer choice, and higher reliability. The conventional distribution system planning is inadequate for this purpose. Following the new TEDS paradigm, an incremental capacity auction (ICA) is proposed in this paper considering: 1) bids for power capacity from all energy sources (DERs and transmission), 2) bids for network asset upgrades from equipment vendors, and 3) bids from new loads. A holistic auction settlement procedure is developed for the proposed ICA mechanism that can concurrently determine the optimal power capacity to be procured and network asset upgrading, while maximizing social welfare. Further, locational marginal price for power capacity demand is estimated as a by-product of the ICA solution. Benefits are demonstrated via case studies and include increased participation of DERs to supply energy, maximizing the social welfare, and enabling assets deferral considering the available local resources.es
dc.language.isoenges
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleDeregulated Distribution System Planning - Incremental Capacity Auction Mechanism with Transactive DERses
dc.typearticlees
dc.identifier.doi10.1109/TPWRD.2022.3150256
dc.issue.number6es
dc.journal.titleIEEE Transactions on Power Deliveryes
dc.page.initial4515es
dc.page.final4526es
dc.relation.projectIDThis work was supported in part by the Independent Electricity System Operator (IESO) and done at the Center for Urban Energy, Ryerson University.es
dc.rights.accessRightsopenAccesses
dc.subject.keywordDistribution system planninges
dc.subject.keywordIncremental capacity marketes
dc.subject.keywordTransactive energy systemes
dc.volume.number37es


Files in this item

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internacional