Show simple item record

A Real Test System For Power System Planning, Operation, and Reliability

dc.contributor.authorMahdavi, Meisam
dc.contributor.authorSabillon-Antunez, Carlos
dc.contributor.authorAjalli, Majid
dc.contributor.authorMonsef, Hassan
dc.contributor.authorRomero, Rubén
dc.date.accessioned2024-01-22T13:43:55Z
dc.date.available2024-01-22T13:43:55Z
dc.date.issued2018-02-01
dc.identifier.citationMahdavi, Meisam et al. “A Real Test System For Power System Planning, Operation, and Reliability.” Journal of Control, Automation and Electrical Systems 29 (2018): 192 - 208.es
dc.identifier.issn2195-3899
dc.identifier.urihttps://hdl.handle.net/20.500.12412/4950
dc.description.abstractNowadays, several test systems available in the specialized literature are used to verify studies regarding power system planning or network reliability. However, there are no test systems currently available with enough information in order to endorse studies that simultaneously approach expansion planning, operation, and reliability issues. This paper introduces a real test system, including the load modeling, and generation and transmission systems. The main objective is to provide all the details and information required to evaluate methods and models developed for power system planning, operation, and reliability. The presented load modeling includes hourly, daily, weekly, monthly, and seasonal patterns. Furthermore, besides the substation data, reliability details, construction costs, and characteristics of right of ways (e.g., line length, impedance, and ratings) for the transmission system are exposed. The real transmission system presented contains 39 buses, 135 transformers, and 66 lines at two voltage levels: 230 and 400 kV. Finally, the generation system reliability data as well as operation and installation costs for each unit are also provided.es
dc.language.isoenges
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleA Real Test System For Power System Planning, Operation, and Reliabilityes
dc.typearticlees
dc.identifier.doi10.1007/s40313-017-0361-8
dc.journal.titleJournal of Control, Automation and Electrical Systemses
dc.page.initial192es
dc.page.final208es
dc.rights.accessRightsopenAccesses
dc.subject.keywordNetwork reliabilityes
dc.subject.keywordPower system operationes
dc.subject.keywordPower system planninges
dc.subject.keywordReal test systemes
dc.volume.number29es


Files in this item

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internacional