Show simple item record

Capacity Market for Distribution System Operator – with Reliability Transactions – Considering Critical Loads and Microgrids

dc.contributor.authorMohamed, Amr A.
dc.contributor.authorSabillon-Antunez, Carlos
dc.contributor.authorGolriz, Ali
dc.contributor.authorLavorato, Marina
dc.contributor.authorRider, Marcos J.
dc.contributor.authorVenkatesh, Bala
dc.date.accessioned2024-01-22T14:05:01Z
dc.date.available2024-01-22T14:05:01Z
dc.date.issued2023
dc.identifier.citationAdel, Amr & Sabillon, Carlos & Golriz, Ali & Lavorato, Marina & Rider, Marcos J. & Venkatesh, B.. (2022). Capacity Market for Distribution System Operator – With Reliability Transactions – Considering Critical Loads and Microgrids. IEEE Transactions on Power Delivery. PP. 1-14. 10.1109/TPWRD.2022.3200869.es
dc.identifier.issn1937-4208 (online)
dc.identifier.issn0885-8977 (print)
dc.identifier.urihttps://hdl.handle.net/20.500.12412/4959
dc.description.abstractConventional distribution system (DS) asset planning methods consider energy only from transmission systems (TS) and not from distributed energy resources (DER), leading to expensive plans. Newer transactive energy DS (TEDS) asset planning models, built on capacity market mechanisms, consider energy from both TS and DERs, leading to lower-cost plans and maximizing social welfare. However, in both methods the cost of higher reliability requirements for some users are socialized across all users, leading to lower social welfare. In this paper, a novel transactive energy capacity market (TECM) model is proposed for DS asset planning. It builds on TEDS incremental capacity auction models by provisioning for critical loads to bid and receive superior reliability as a service. The TECM model considers these reliability transactions, in addition, to selling energy transactions from TS and DERs, buying energy transactions from loads, and asset upgrade transactions from the network operator. The TECM model allows for islanded microgrids and network reconfiguration to maximize social welfare. The TECM model is assessed on several case studies, demonstrating that it achieves higher social welfare and a lower plan cost.es
dc.language.isoenges
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleCapacity Market for Distribution System Operator – with Reliability Transactions – Considering Critical Loads and Microgridses
dc.typearticlees
dc.identifier.doi10.1109/TPWRD.2022.3200869
dc.issue.number2es
dc.journal.titleIEEE Transactions on Power Deliveryes
dc.page.initial902es
dc.page.final916es
dc.relation.projectIDThis work was supported in part by the Independent Electricity System Operator (IESO) and done at the Center for Urban Energy, Ryerson Universityes
dc.rights.accessRightsopenAccesses
dc.subject.keywordDistribution systemses
dc.subject.keywordFlexible capacityes
dc.subject.keywordReliabilityes
dc.subject.keywordCritical zoneses
dc.subject.keywordUnserved energyes
dc.subject.keywordTransactive energyes
dc.subject.keywordPlanninges
dc.volume.number38es


Files in this item

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internacional