Show simple item record

Integrated Transmission and Distribution System Expansion Planning Under Uncertainty

dc.contributor.authorMuñoz-Delgado, Gregorio
dc.contributor.authorContreras, Javier
dc.contributor.authorArroyo, José M.
dc.contributor.authorSánchez de la Nieta, Agustín
dc.contributor.authorGibescu, Madeleine
dc.date.accessioned2025-08-14T06:53:28Z
dc.date.available2025-08-14T06:53:28Z
dc.date.issued2021-04-06
dc.identifier.citationG. Muñoz-Delgado, J. Contreras, J. M. Arroyo, A. Sanchez de la Nieta and M. Gibescu, "Integrated Transmission and Distribution System Expansion Planning Under Uncertainty," in IEEE Transactions on Smart Grid, vol. 12, no. 5, pp. 4113-4125, Sept. 2021, doi: 10.1109/TSG.2021.3071385es
dc.identifier.issn1949-3053
dc.identifier.urihttps://hdl.handle.net/20.500.12412/6760
dc.description.abstractThe increased deployment of distributed generation calls for the coordination and interaction between the transmission and distribution levels. This requirement is particularly relevant for planning purposes when renewable-based generation is involved. Unfortunately, in current industry practice, transmission and distribution network planners solve their problems independent of each other, thereby leading to suboptimal solutions. Within this context, this paper addresses the integrated expansion planning problem of transmission and distribution systems where investments in network and generation assets are jointly considered. Several alternatives are available for the installation of lines as well as conventional and renewable-based generators at both system levels. Thus, the optimal expansion plan identifies the best alternative for the candidate assets under the uncertainty associated with demand and renewable-based power production. The proposed model is an instance of stochastic programming wherein uncertainty is characterized through a set of scenarios that explicitly capture the correlation between the uncertain parameters. The resulting stochastic program is driven by the minimization of the expected total cost, which comprises the costs related to investment decisions and system operation. The associated scenario-based deterministic equivalent is formulated as a mixed-integer linear program for which finite convergence to optimality is guaranteed. Numerical results show the effective performance of the proposed approach.es
dc.description.abstractEs la versión aceptada del artículo. Se puede consultar la versión final en https://doi.org/10.1109/TSG.2021.3071385es
dc.language.isoenges
dc.titleIntegrated Transmission and Distribution System Expansion Planning Under Uncertaintyes
dc.typearticlees
dc.identifier.doi10.1109/TSG.2021.3071385
dc.issue.number5es
dc.journal.titleIEEE Transactions on Smart Grides
dc.page.initial4113es
dc.page.final4125es
dc.rights.accessRightsopenAccesses
dc.subject.keywordDistributed generationes
dc.subject.keywordIntegrated transmission and distribution planninges
dc.subject.keywordNetwork and generation investment decisionses
dc.subject.keywordStochastic programminges
dc.subject.keywordUncertaintyes
dc.volume.number12es


Files in this item

This item appears in the following Collection(s)

Show simple item record